Rehabilitation Work for one (1) unit 300MW IHI boiler. The scope involved tube bending, panel fabrication and site erection works for superheaters (20 panels), outlet re-heaters (500 panels) and one outlet steam header (20 tons). The re-heater tubes were fabricated, acid washed, steam cleaned and painted at our factory in Nilai. The re-heater outlet header was supplied by the OEM. A 100% radiographic test was conducted on all weld joints. IHI was the OEM of the boiler and they provided engineering and technical supervision for the project.
Installing the new Re-heater header Installing the new re-heater tube panels Removing of old re-heater outlet header Re-heater tube panels ready for delivery