Unit 4 Boiler Rehabilitation Project

LocationTNBG Kapar Power StationBoiler Size300MW X 192Barg, IHI Utility Boiler, Unit 4Share

Rehabilitation Work for one (1) unit 300MW IHI boiler.  The scope involved tube bending, panel fabrication and site erection works for superheaters (20 panels), outlet re-heaters (500 panels) and one outlet steam header (20 tons).  The re-heater tubes were fabricated, acid washed, steam cleaned and painted at our factory in Nilai.  The re-heater outlet header was supplied by the OEM.  A 100% radiographic test was conducted on all weld joints.  IHI was the OEM of the boiler and they provided engineering and technical supervision for the project.