PROJECT : MPI Polyester Sdn Bhd RM120,000,000
PETChip Plant, Shah Alam, Selangor
Project Description : The MPI Polyester PETChip RM120,000,000 Plant  was designed by John Brown Engineering, Germany with a capacity of 60 tones/day of PETChips.

Tenaga Tiub was fully responsible for the supply and installation of all pressure vessels, reactor, tanks, process pumps, valves, piping and pipe-racks including testing/commissioning of the entire Chemical Plant.

   
 
Piperack and piping work c/w insulation
 
 
Thermal Oil Heater Plant
 
   
 
Pumps Installation
 
 
Process Piping